The Manufacturing Facility
Land Utilization
1.8347 Acres
Buildings Completed
1997
Floor Space Utilization Building 1
- Design—1,200 sf
- Manufacturing—15,000 sf
- Dock/Assembly—3,000 sf
- Verification/Testing (CMM)—1,200 sf
- Office/Administration—2,600 sf
- Upstairs Storage Loft—3,000 sf
Floor Space Utilization Building 2
- Storage Barn—4,400 sf